
Prevent conflicts before they reach the field.
BIM coordination, MEP clash detection, 4D scheduling, and Scan to BIM, led by a senior VDC engineer with experience on projects up to $1.5B.
Academic depth, field tested
Stanford CIFE training applied to hospitals, laboratories, and pharmaceutical campuses.
Engineering plus software
Published Autodesk plug-ins built from real coordination workflows.
Bilingual delivery
Direct technical communication for US and Latin American teams.
The disciplines that reduce execution risk.
Every engagement is led by a senior practitioner. No account-management layers or junior coordinators between your team and the person making decisions.
01BIM / MEP Coordination
Federated model review, clash prioritization, issue ownership, and weekly resolution across every trade.
View service
024D Scheduling
Schedule-linked models that expose phasing, logistics, and trade-stacking risks before construction.
View service
03Scan to BIM
Registered point clouds converted into verified as-built models for renovation and tie-in coordination.
View service
Mixed-Use Student Housing Tower
Experience is demonstrated through outcomes.
Led VDC planning and site logistics for a 15-story mixed-use student housing tower with 6 below-grade parking levels in downtown Madison, WI. The urban site required complex sequencing to manage tower crane operations, material staging, and adjacent street impacts simultaneously. Delivered a full 4D construction simulation linking the Revit model to the project schedule to expose phasing conflicts before they hit the field. MEP coordination and underground utility modeling were executed across all trade disciplines from preconstruction through construction documents.
Direct technical ownership from kickoff to closeout.
Define
Align scope, deliverables, model standards, and the coordination cadence.
Coordinate
Federate models, prioritize conflicts, and drive resolution with every discipline.
Verify
Document decisions, validate closeout, and hand over an auditable record.
Let’s review your project’s coordination risk.
Share the project type, phase, and scope. We respond within 24 hours.
Discuss a Project